This chapter provides details on the procedures required to setup a hydrodynamic analysis.
- 5.1. Create a Hydrodynamic Analysis System
- 5.2. Attach Geometry
- 5.3. Mesh
- 5.4. Add Project Information and Options
- 5.5. Define Parts Behavior
- 5.6. Attachment Point Groups
- 5.7. Dynamic Point Structures
- 5.8. Line Body Data
- 5.9. Define Connections
- 5.10. Establish Analysis Settings
- 5.11. Applying Ocean Environment and Forces
- 5.12. Solution
- 5.13. Aqwa Model Data Import