To update all cells in the project that are in an Update Required state, update the entire project.
If a project contains multiple design points, only the current design point is updated.
If a project contains parametric (DesignXplorer) systems, updating a parametric system updates the design points within that system, but does not update the design points in the parameter set.
Parametric systems are not updated when a project update is submitted to Remote Solve Manager (RSM). For more information, see Submitting Workbench Project Updates to Remote Solve Manager.
To update a project:
To save the project, from the menu bar, select
> .If you choose not to save the project and any cells are configured to use RSM or run in the background, you must change the solution process settings of those cells to run in the foreground before you can update.
To update the project:
From the menu bar select
> .On the Project tab toolbar click .
Right-click the white space on the Project Schematic and select from the context menu.