This chapter provides details on the procedures required to setup a hydrodynamic analysis.
- 5.1. Create a Hydrodynamic Analysis System
 - 5.2. Attach Geometry
 - 5.3. Mesh
 - 5.4. Add Project Information and Options
 - 5.5. Define Parts Behavior
 - 5.6. Attachment Point Groups
 - 5.7. Dynamic Point Structures
 - 5.8. Watch Zones
 - 5.9. Line Body Data
 - 5.10. Define Connections
 - 5.11. Establish Analysis Settings
 - 5.12. Applying Ocean Environment and Forces
 - 5.13. Solution
 - 5.14. Aqwa Model Data Import