Figure 12.202: Steps to create a water entity
Step | Operation |
1st step | Select | on the ribbon menu as shown in the figure above.
2nd step | Select the Water entity as shown in the figure above. |
3rd step | Select the base body. The base is the parent body for Water. |
4th step | Define position of water reference frame or water surface reference frame. |
5th step | Define the Z-direction of water reference frame. |
6th step | Define the X-direction of water reference frame. |
7th step | Define the shape of water |
8th step | Define entity name |
9th step | Click the | or button.