Changing the Cost Function Norm

Follow this procedure to select the norm used in the calculation of the cost goal.

  1. In the Setup Optimization dialog box, click the Goals tab.
  2. Select Show Advanced Options.
  3. Select a norm from the drop-down list in the Cost Function Norm Type field. The options are L1, L2, and Maximum. L2 is the default.

Related Topics

Explanation of L1, L2 and Max Norms in Optimization

Cost Function