Stopping or Aborting Simulation Progress
- To abort progress, right-click in the Progress window and select Abort.
- To stop the simulation cleanly between time steps, right-click in the Progress window and select Clean Stop.
- To change priority, right-click. From the Change Priority submenu, select from Highest, Above Normal, Normal, Below Normal, and Lowest.
Stopping and Restarting Time Decomposition Method Analyses
- For Time Decomposition Method (TDM) analyses, invoking Clean Stop stops the analysis after completion of the current time subdivision, instead of after completion of the current time step. As a result, continuation of the solution process will start from the next time subdivision after clicking Analysis. In such a case, the stop time cannot be modified when TDM is used.
- When Clean Stop is invoked for projects in which a TDM transient source design is linked to a transient target design, after completion of the source design the solution process can continue from the target design. In such a case, the target design must be non-TDM.